Empennage Installation
Rudder and horizontal stabilizer installed.
Cinch straps installed to level horizontal stabilizers for
fabrication and installation of support cables.
Support cables fabricated and installed.
(The yellow measuring tapes are used to square, and level the stabilizers)
Right and left side support cables fabricated and
installed.
The Horizontal stabilizers have been removed for covering.